The plastic construction formwork has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information please contact me:
Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207

beizhu plastic formwork good demoulding effect



Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The construction formwork has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information please contact me:
Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207

The moulding effect of Beizhu plastic formwork


Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The plastic construction formwork has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information please contact me:
Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207

2016年12月18日星期日

customer visit of beizhu plastic construction formwork factory



Beizhu  plastic construction formwork  in China provide construction formwork with good quality and better service.

The  plastic construction formwork k has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information about  plastic construction formwork , please contact us:

Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207
www.bzformwork.com

customer visit of Beizhu plastic formwork factory



Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The plastic construction formwork has many advantages as below:
1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information about plastic construction formworkplease contact me:

Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207
www.bzformwork.com

The moulding effect of Beizhu plastic formwork



Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The plastic construction formwork has many advantages as below:

1.Can be used more than 60 times, even 80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.


More information about plastic construction formwork please contact me:

Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207
www.bzformwork.com

2016年12月16日星期五

load bearing test of plastic formwork Beizhu



Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The plastic construction formwork has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information about plastic construction formwork please contact me:

Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207
www.bzformwork.com

hardness test of plastic construction formwork of Beizhu



Beizhu plastic construction formwork in China provide construction formwork with good quality and better service.

The plastic construction formwork has many advantages as below:

1.Can be used more than 60 times, even80-100 times.
2.Our formwork is waterproof. has good forming effect.
3.Our formwork do not need release agent.
4.Our PP formwork can be installed and removed quickly, shorten the working hours of workers, reducing the personnel costs.
5.Our PP formwork can save cost more than 50% than the traditional template.

More information about plastic construction formwork ,please contact us:

Beizhu05@beizhugroup.com
Whatsapp: 0086 134 5314 5207
www.bzformwork.com

2016年12月6日星期二

How To Operate your Construction with Plastic Construction Formwork?

1.When the hollow building template is used on the intersecting surface , it can be 14 mm thick, when used for transverse shear wall it should be 14 ~ 15 mm thick.

2. The distance between wood: (1) on the surface of the intersection wood square distance according to the thickness of the slab concrete, in general, if the thickness of slab concrete is less than 0.15 m ,the wood square distance  should be 250 ~ 300 mm.(2) the distance between wood of  the shear wall is adjusted by the height and thickness of the wall, for example, the wall is 2800 mm high and  300 mm thick, wood square distance should be 100 ~ 200 mm using a 14 mm thickness template, and be 150 ~ 250 mm with 15 mm thick planks of wood, if the shear wall, width of the pillar is thick more than 1 m, must add the fixed frame.

3. Between plastic construction formwork is normally should no space, but if the temperature difference is 5 ~ 10 ℃, then should reserve 1 ~ 2 mm gap.

4. There shouldn't be gaps between the die shear wall and column puzzle, there must be wood square in internal Angle (the bottom of the wall) beam to insure the beam frame, wall and templates connect well. Shear wall plastic construction formwork must be assembled into the whole piece before lifting, and then spread tablet, thus can reduce labor intensity, as well as improve the forming effect .

5. When nailing the plastic construction formwork, the distance between the template edge and nail should be 15 ~ 30 mm, the strength of driving nail should be moderate, length of nails should be 30 ~ 35 mm, not too long or too short.

6.There must be a seam allowance for the wood in the beam bottom,make the wallboard stand on seam allowance of wood square, thus can ensure the leak leak not slurry and save wallboard material efficiently.

Testing Report
The testing is done under the following parameters:
1. Capability of material to last up to 60 times usage.
2. Flexibility and strength of materials
3. Heat resistance
4. deformation
5. water and moisture resistance
6. pull off capacity

If you have any questions or interest in our plastic construction formwork
please call me at  8613453145207. You can also email to Beizhu05@beizhugroup.com.

Comparison of Metal and Plastic Construction Formwork

In the large construction market we can see many kinds of plastic construction formwork  They are made by different materials, such as metal, hollow plastic, common plastic, steel, bamboo, playwood and so on.

Today i will show the difference between our Beizhu Hollow plastic construction formwork with metal formwork panel. See as follows:

1.The price of metal formwork is much higher than plastic formwork panels.

2.Because of the heavy weight of the metal formwork panels, the builder need to rent cranes and other equipment. The rent fee is also a big cost.


3.Because of the heavy weight of the metal formwork panels, the labor cost is higher, the speed of installation and speed of demoulding is slow.

4.The metal formwork panels must be used in High - rise building, in order to reduce the use of costs. If the floor number of the building is less than 30,we do not suggest to choose metal formwork panels.

5.Because of the re-usability, if use PP hollow plastic formwork to construct 30-storey high-rise, just need to purchase plastic construction formwork for 3 storeys. 

6.When use aluminum alloy formwork panels, the structural drawings and construction drawings must be very accurate, and need to design the size of formwork panels in advance, otherwise the size of formwork panels can not suitable for the project.

7.When using aluminum formwork ,size can not be modified, but plastic construction formwork can be cut according to the requirements.




8. One-time investment of metal formwork is high, very expensive.

9.After using, the surface of concrete and aluminum had a chemical reaction, the concrete surface is smooth, but there will be some small bubbles.

10. Because there is no corrosion resistance, so the aluminum formwork panels cannot be used on construction basement.



For more information about plastic construction formwork, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

What is Plastic Construction Formwork ?

Plastic ConstructioFormwork is a die or a mould which used to shape and support the concrete until it attains sufficient strength to carry its own weight, including all supporting structures. It should be capable of carrying all imposed dead and live loads apart from its own weight.

Introduction to plastic construction formwork
 Since the beginning of concrete construction formwork panel has been in use.
 There are nay new materials such as plastics, steel, and fiberglass are used in formwork panel.
 Man has pay greater attention to the erection, fabrication, design, and dismantling of formwork panel.




Defenition:
 1. As a structure
 2. Form it into the required shape and dimensions.
 3. Temporary which is designed to contain fresh fluid concrete.
 4. Support it until it cures sufficiently to become self supporting.


The term ‘plastic construction formwork includes the actual material contact with the concrete, known as form face, and all the necessary associated supporting structure.

For more information about plastic construction formwork, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

Why our Plastic Construction Formwork has such a Big Market? (2)

Beizhu group is one of  the most advanced plastic construction formwork factory  in China.We developed and manufactured plastic formwork since 2008.

The new material plastic construction formwork has many advantages:

To be continue.

7. Waste products can be recycled and reprocessed, making full use of waste materials, This property can greatly reduce the project cost, compared with wooden formworks  and bamboo formworks.

8. Environmental protection and energy saving, no pollution. Without any poisonous or harmful gas.

9.Demoulding easily. No need brushing release agent, only tapping, the plastic construction formwork will fall off. Shorten working hours and speed up the construction schedule efficiently.

10. Easy to process. Sawing, drilling and nailing are all available. Plastic construction Formwork can be combined vertically and horizontally optionally


11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate, advantageous to the organization construction, effectively improving the construction schedule. Save cost up to 50%.



For more information about plastic construction formwork, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

Why our Plastic Construction Formwork has such a Big Market? (1)

Beizhu group is one of the most advanced plastic construction formwork factory in China.We developed and manufactured plastic formwork since 2008. Beizhu has exported the products worldwide like Europe, Australia, Vanuatu, America, Thailand, Korea, Japan, Algeria and so on.

The new material plastic construction formwork has many advantages:

1.Light weight, high strength, high hardness, impact resistance, wear resistance.

2. Surface is smooth, bright and clean; Casting molding effect is good.








3.No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

4. Good toughness. Can be used to make other different shapes and size plastic construction formwork.

5. Acid and alkali resistance, corrosion resistance; Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the plastic construction formwork, which do not pollute the concrete surface.



6. The times of reuse can reach more than 60 times, even80-100 times, long service life.

For more information about our plastic construction formwok, please contact with me 

+ 86134 5314 5207.

Beizhu05@beizhugroup.com.